PV Feedin tariff Rates from  July  1st –Sept 30th 2017

 

Below are the current rates of feedin tariff available for PV systems in the higher rate. You must have an EPC of the property to Level D before the PV system is installed. There are some exceptions for community and listed buildings.

 

PV size System

KW

Generation tariff (p/kwh)

Export Tariff

(p/Kwh)

1-10

4.07

5.03

10-50

4.29

5.03

50-250

1.94

5.03

 

Worked example

 

If you generate 4000 units of Electric a year you will receive

Total Generated x £0.0407

Deemed export x £0.0503

It is deemed that you have consumed 50% and Exported 50%

 

Therefore

 

4000 x £0.0407 =  £162.80

 

4000 x 50% = 2000 x £0.0503 = £100.60

 

Total income  £263.40p yr for 20 yrs index linked to RPI.

 

RPI increases are added to both tariffs every April

Latest Prices

PV System

4kw SunPower E20 327 watt panels £7500

4Kw PV with 2.4kw Battery Back up £6950

4kw Pv system From £4950

2.4kw Battery System £2400

4.8kw Battery System £3300

7.2kw Battery System £4200

9.6kw Battery System £5100